EFFICIENT LOADING PROCESS

PHASES 1-4

1 - FIRING COMMENCES: The load unit gives priority to bringing the boiler up to temperature quickly.
2 - LOADING BEGINS: A high, guaranteed return temperature to the boiler is maintained throughout the entire combustion cycle.
3 - DURING LOADING: The good control performance ensures efficient storage loading and good stratification in the storage tank.
4 - FIRING ENDS: By closing the upper port completely, the flow is led straight to the storage tank, taking care of all the heat in the boiler.